Project 3 Update 2

Boardwalk scrap removal started out well. With a little ingenuity we were able to transport loads of scrap right into the dumpster, little hand work. Moving right along and half done with the 1st dumpster by 9:30. Oops, we have a flat tire on the tractor. Had to know with all the old boards and nails we would find one sooner or later. Luckily it was on the front(smaller tires). Quick trip to shop for proper tools, then to town, tire repaired, back in business by lunchtime. Dumpster full before the end of the day.

Leave a Reply

Your email address will not be published. Required fields are marked *