The ditches on the volunteer job site are full of water to the very top. Fortunately, they are used to moving water around here. One fire pump and a transfer pump get it down to about 6” of water and another 6” of muck. It is an improvement though. We pull wire and re-bury conduit. It is a lot of shoveling and slogging in the mud but feels good to get it done. Three new sites with power and water. Yeah.